Skip to main content

Progress Report Format

To Download
II  Click Here  II

Comments

Popular posts from this blog

SP 16 :1980 - Design Aids for Reinforced Concrete to IS:456

The structural practice handbook  SP:16-1980   Design Aids for Reinforced Concrete to IS:456-1978  has tables and charts that helps structural engineers to rapidly design simple sections. Even though the design aid is based on the 1978 code, it continues to be used without revision as there have been no major changes to Section 5, on which the design aid is based. To Download II    Click Here    II

IS 13920 : 2016 -Ductile Design and detailing of reinforced concrete structures subjected to seismic forces-Code of practice

IS 13920 : 2016 - Ductile Design and detailing of reinforced concrete structures subjected to seismic forces-Code of practice  since it was first published in 1993. Most of the older provisions have been redrafted and modified for greater clarity and new provisions have been added. Much of the this revision is based on the IITK-GSDMA document of proposed draft provisions. To Download II    Click Here    II

IS 1893 (Part 1) : 2016 - Criteria For Earthquake Resistant Design Of Structures - General Provisions And Buildings

The provisions of this standard are applicable for design of structures like parking structures, security cabins and ancillary structures taking into account appropriate earthquake effects as per this standard. This standard is also applicable for design of temporary elements, such as scaffolding and temporary excavations. This standard does not deal with construction features relating to earthquake resistant buildings and other structures. For guidance on earthquake -resistant construction of buildings, reference may be made to the latest revisions of the following Indian Standards:  IS 4326, IS 13827, IS 13828, IS 13920, IS 13935 and IS 15988. The provisions of this standard are applicable even to critical and special structures, like nuclear power plants, petroleum refinery plants and large dams. For such structures, additional requirements may be imposed based on special studies, such as site-specific hazard assessment. In...